The back of the house:
Here is the huge ridge beam that will be exposed in the living room/entry. The lumber yard "forgot" to order the rafters that will come off of this beam, so we have another week until those get here. In the meantime, Layne put up the I-Joists (there to hold the insulation above the area, but they will not show) and covered it as much as he could so our concrete floors could get finished:
Here is what our floors looked like before they were stained...pretty shiny due to 6 coats of sealer!
After many test samples, we decided to go with a chocolate brown color. It's a little wild for me, but Joe and Layne keep trying to reassure me that it will be fine. :) I tried to get some good pictures, because most people think we're out of our minds for putting in concrete floors (they're probably thinking it will look like a garage floor. We will grout the grooves, so it will look like large 3'x3' tiles. I've already started to look for some fun area rugs.
Finished floors in living room:
Now that the floors are done, they will lay down protective cardboard and start going crazy inside. Windows, siding, roof, interior walls, electrical, plumbing, drywall will all go in over the next couple of weeks! It seems like we've been waiting forever for the floors to get done, but now things should get moving.
They also drilled our well last week. The hit a good water source at 300 feet! Here are some pictures of the drilling rig:
I thought it was cool that the truck's front end was off the ground:
This is where the drill went into the ground:
All done:
The water line comes in next to the electrical box by the garage:
Thanks for checking in on us!!! Tara